Simplified assessment
Four imperfection cases are checked independently. Meeting both displayed checks does not establish full pipeline code compliance or post-buckling stability.
Uplift demand & cover
Total downward restraint = net operating pipe weight + soil uplift resistance. Minimum cover uses the selected OTC soil equation.
Separate elastic stress screen
Unfactored axial force and initial profile bending; Lamé hoop / radial stresses. Von Mises is checked at both bending extremes on both wall surfaces using the same assessment wall throughout.
Calculation details
Save This Calculation
Sources, equations & limits
Uplift method: Palmer, Ellinas, Richards and Guijt (1990), Design of Submarine Pipelines Against Upheaval Buckling, OTC 6335, equations (6)–(11), (13) and (14), from the supplied paper.
ΦL = L √(P / EI); wrequired = Φw δ P² / EI. P is positive effective compression multiplied by the project load factor once.
- ΦL ≤ 4.49: Φw = 0.0646.
- 4.49 < ΦL < 8.06: Φw = 5.68 / ΦL² − 88.35 / ΦL⁴.
- ΦL ≥ 8.06: Φw = 9.6 / ΦL² − 343 / ΦL⁴.
Rounded paper coefficients have small jumps at the boundaries; they are used as printed. Cohesionless soil: q = γ(DH + fH²). Cohesive soil: q = cᵤ min(H, 3D). D in soil equations is coated diameter. Cover is solved analytically, with no circular iteration.
Additional modelling assumptions: fully restrained F = (1 − 2ν) Δ(pi Ai − po Ao) + EAαΔT − residual lay tension. Direct-force mode bypasses this expression. Initial single-prop bending M = 12 EI δ₀ / Lstress². These are explicit elastic / profile assumptions, not an OTC-prescribed load factor or stress acceptance rule.
σa = (pi Ai − po Ao − F) / A. Lamé stresses σh = a + b/r² and σr = a − b/r²; a = (pi ri² − po ro²)/(ro² − ri²), b = (pi − po)ri²ro²/(ro² − ri²). Longitudinal stress is σa ± Mr/I. The reported equivalent stress includes all three principal stresses.
Scope: simplified elastic assessment of individual idealised imperfections. It does not solve route-wide anchor positions, axial friction, plasticity, upheaval displacement or nonlinear post-buckling response. Enter a project-derived effective force where full restraint is inappropriate. A stress failure also calls the elastic uplift assumptions into question.
Historical comparison: the supplied Gas Injection Pipelines 8 Inch Rev 1 workbook (85 °C) and PDF (60 °C) are benchmark sources, not governing standards. Their OED soil and Finch friction references are unavailable. This calculator uses OTC soil equations and a consistent-wall three-dimensional stress screen, so cover and stress results intentionally differ from the historical sheets.