Building proximity distance
Whole-metre rounding is upward and is an application convention, not a separate PD 8010 requirement.
Calculation breakdown
Applicability & next assessment
Save This Calculation
PD 8010 method & source
Basis: PD 8010-1:2015+A1:2016, 5.5.3.1 and 5.5.3.2, equation (1), Tables 1 and 3; pressure symbol from 3.2. Verified against the local standard, printed pages 12, 20 and 24–25. BSI publication details.
Equation (1): Y = Q (Dₒ²/32000 + Dₒ/160 + 11) (p/3.2 + 1.4), with Dₒ in mm, p in N/mm² and Y in metres. The equivalent pressure term for bar is pbar/32 + 1.4. It applies for design factor ≤ 0.72. Category C pressure below 35 bar is assessed at 35 bar.
Q is always taken from Table 3: 0.3 for category C, 2.5 ammonia, 0.8 ethylene, 0.45 hydrogen, 1.0 liquid petroleum gas and 1.25 natural gas liquids. CO₂ uses informative factors 2.0 (dense phase) and 1.0 (gas phase), subject to a documented supporting basis. An other substance classed as category C uses the category C row; one classed as category E uses the Table 3 row selected for it, with the analogy recorded as the project basis. Q is never entered directly.
Natural gas (category D): equation (1) is not used. Where the design factor does not exceed 0.30 and the wall thickness is at least 11.91 mm, the distance is 3 m. Where the design factor exceeds 0.30 and/or the wall thickness is less than 11.91 mm, IGEM/TD/1 should be followed: use the IGEM TD/1 Type R or Type S building proximity calculator.
For categories C and E the reduced initial-route option is selected explicitly: 3 m for category C at factor ≤ 0.30, and 5.5Q m for category E at factor ≤ 0.30 and wall ≥ 11.91 mm.
Where individual risk contours exist, use the distance to the 10 cpm contour. These contours are not calculated by this tool. Categories A/B require designer-selected separation. Land-use controls can require greater distances. Initial-route methods do not replace risk-based final design or required societal-risk assessment.